0
Follow
2
View

MBF2 Intelligent network out-of-band management

dead1999 注册会员
2023-02-27 10:30

Based on Monster group and GPT write:
The following:

  1. Connect one optical fiber to the first optical port of the MBF2512C inic and the other optical fiber to an idle optical port on the switch.
  1. Connect another optical fiber to the second optical port on the MBF2512C inic and connect the other end to an idle optical port on server 1.
  1. Connect one network cable to the electrical port of the MBF2512C intelligent NIC and the other end to an idle network port on the switch.
  1. Connect another network cable to a free network port on server 2 and the other end to a free network port on the switch.

About the Author

Question Info

Publish Time
2023-02-27 10:30
Update Time
2023-02-27 10:30